Installation

System Installation 

MAC systems may be installed and calibrated in as little as three days, usually in two steps, with the support of the EM vendor. The system can be installed on new EM sites as an insurance against EM interference, or on existing sites that are experiencing unanticipated low frequency magnetic field interference. Coils are installed in a neat and inconspicuous manner, ensuring that room aesthetics are not compromised.